Lodge News

More News

NEW LODGE PURCHASED IN SEPTEMBER

Lots of changes are being made.  First, the parking lot will be repaired during October. Kitchen and bar fixtures are being replaced. Bathrooms are being upgraded. Outside trim on the building is being repaired and painted.

Posted by: Brownsville, TX #2876 (10/02/2024)


Back to top
 
 
Server: www